Well Drilling Pros

Well Pump Replacement in Marion County, IN

Well drilling typically runs $3,000–$16,000 nationally, per our cost guide. Independent local pros serving Indianapolis, Center Township, Decatur Township and nearby communities. Describe the problem and we'll route your request — free, no obligation.

  • Mark no-water pump problems as emergencies on the form
  • County pages on local well depths, aquifers, and permits
  • Well inspections, water testing, and treatment
  • Free to use — no obligation, no markup

Fast response from independent local providers. No obligation.

Typical national cost$3,000 – $16,000Cost guide →

Request Help Now

Three quick steps. We'll route your request to an independent local provider.

Step 1 of 3Your project

What do you need help with?

Service needed
How urgent is it?

Free · No obligation · Independent local pros

Local Help in Marion County, IN

Swapping a well pump in Marion County involves two layers of rules: Indiana licenses whoever installs or repairs water well pumps, and Chapter 18 of the Code of the Health & Hospital Corporation of Marion County adds county notice, permit and water-sample steps. The Marion County Public Health Department (MCPHD) says it regulates the construction of private wells and well pumps through state and local ordinances.

For the equipment, NGWA's 2021 Well Owner's Guide quotes recent survey data: $3,000 to $3,200 for the typical household submersible, while the typical household jet pump is put at about $1,545 to $1,570, with a caution that costs can vary over time and by location. Chapter 18 adds a $50 pump permit and inspection fee (Gen. Ord. 5-2023, effective July 1, 2023).

Requests from well owners anywhere in the county are passed to independent local well and pump contractors; Cornelia Cove does not drill wells or install pumps. Because Chapter 18 puts the MCPHD notice and the pump permit application on the licensed pump installer, ask each contractor whether both are part of the quote.

Marion County Service Details

What providers in this area actually see: coverage, common jobs, local pricing factors, and rules worth knowing.

Service Area Notes

  • Requests are accepted from all nine townships the Census Bureau lists in Marion County (Center, Decatur, Franklin, Lawrence, Perry, Pike, Warren, Washington and Wayne) and from the places it lists there: the consolidated city of Indianapolis, the cities of Beech Grove, Lawrence and Southport, and the towns of Speedway and Cumberland (Cumberland also extends into Hancock County).
  • Chapter 18-102: if the Health Officer determines that water from a private well used for drinking, food preparation, washing or other direct human contact presents a chemical, biological or radiological risk to the people it serves, then whenever a public water main becomes available within 100 feet of any property line of the residential or business property the well serves, the owner must connect to the main as soon as practicable, abandon the well under 312 IAC 13-10-2 as soon as practicable and report the abandonment to the Health Officer within two business days. The Health Officer may approve industrial use of such a well on proof that the use will not create a hazard to human health.
  • Before beginning the abandonment of any water well not serving a municipality or a public utility, a licensed water well driller must notify the Health Officer and receive authorization (18-201). Plugging methods are set by 312 IAC 13-10-2; ask MCPHD and the contractor which applies.

Common Jobs in Marion County

  • Submersible pump replacement under a Chapter 18 pump permit
  • Jet pump replacement, or a pump pulled for service and reinstalled (both are permit types on MCPHD's pump application)
  • Installing a pitless adapter after the well seal is broken
  • Adding the sampling faucet Chapter 18-304 requires on pressure systems
  • Well disinfection after the seal is opened, ahead of MCPHD's water sample
  • Arsenic treatment after a test result
  • Well abandonment by a licensed driller when a property connects to a public main

What Drives Pricing Here

  • Permit fees. Chapter 18-202 sets a $50 pump permit and inspection fee, plus a $25 late fee for pump permit applications that are incomplete or received after five business days following the commencement of the well installation; 18-201 sets the same amounts for well permits. Both sections carry Gen. Ord. 5-2023, effective July 1, 2023.
  • Required hardware. When the well seal is broken, 18-204 requires a pitless adapter installed under 312 IAC 13-4-3(d), which must keep contaminants from entering through the casing openings it attaches to and be consistent with the Water Systems Council Listing of Products for PAS-97(04). Submersible pumps need one check valve on the discharge line above the pump and inside the casing (18-302). A pressure system needs a sampling faucet with a smooth, turned-down nozzle on the discharge side of, and as close as possible to, the pump; a hose bib may not be used (18-304).
  • Drawdown floor. 312 IAC 13-4-3.5 sets minimum available drawdown, meaning the gap between static water level and pump setting (13-1-3.2): 20 feet where the well is finished in an unconsolidated aquifer and 50 feet where it is finished in bedrock, unless DNR approves otherwise. That drawdown rule excludes monitoring and dewatering wells.
  • Treatment. MCPHD's February 2014 private well info sheet calls county groundwater very hard (over 180 parts per million calcium carbonate) and naturally high in iron, says manganese is commonly found above the recommended 50 ppb, and says arsenic is commonly elevated in parts of the county.
  • Method: the pump prices here are NGWA's national survey figures, and the $50 and $25 amounts come from Chapter 18 itself. No Marion County price survey, labor rate or depth adjustment has been applied to them.

Permits & Local Rules

  • Notice first. Before installing any pump, uncovering a buried upper terminal to a well or breaking the sanitary seal of a private water supply built under Chapter 18, a licensed pump installer must notify the Health Officer by electronic mail or any other method the department accepts, and receive authorization to proceed. The notice includes a valid address, the location of the installation and any other information the department requires (18-202(a)).
  • Permit after. The installer must obtain a pump permit signed by the Health Officer within five business days after installing the pump, uncovering the terminal or breaking the seal, submitting a completed application on a department-approved form with the $50 fee (18-202(a)). MCPHD's application instructions (revised January 12, 2022) also say five business days, but its Private Well Program page still says two, so confirm the deadline with MCPHD. A permit is void if the installation is not completed in one year (18-203).
  • After the seal of an existing well is broken, the well must be disinfected under 312 IAC 13-9-1, which calls for at least 100 parts per million of chlorine; a well-pit terminal that is not properly drained to the ground surface in the immediate area, or is subject to flooding, counts as buried (18-204). Water from that well may not be used for human consumption until the well has been inspected and samples taken, and both have been approved by the Health Officer, who collects the samples for laboratory analysis of bacteriological quality before approving the supply (18-205).
  • Chapter 18 requires compliance with 312 IAC 12 and 13 as well (18-101) and does not apply to wells used solely to monitor groundwater quality or quantity or for a geothermal heating and cooling system (18-209).
  • State license. Subject to the exemptions below, Indiana requires a DNR license for anybody acting as a well driller or pump installer (IC 25-39-3-1); the pump-installer definition in IC 25-39-2-15.5 reaches every person installing or repairing water well pumps. The licensee installing a pump must carry the license and present it to a DNR representative on request; each license expires December 31 of the year issued. The fee with a license application is $100 for a calendar year (312 IAC 13-2-2(a)).
  • Exemptions. Four exemptions in IC 25-39-1.5-3 switch off chapters 3 and 4 of IC 25-39: (1) a well for personal use measuring at most 1 1/4 inches in inside diameter and at most 24 feet in depth; (2) wells inside those same limits installed by a DNR-registered plumber licensed under IC 25-28.5; (3) installing or fixing a water well pump or other pumping equipment for personal use; (4) a worker directed and personally supervised by someone who holds a license. 312 IAC 13-1-19.3 treats use as personal when the well or pumping equipment used for water supply is located on property the person owns or has in their possession, or, in the case of a public water supply utility, when one of its permanent employees possesses it. Chapter 18's notice and permit sections name the licensed installer, so an owner planning their own pump work should ask MCPHD how the chapter applies.

Geology & Water Table Notes

  • Indiana DNR's May 2011 Marion County aquifer reports say approximately 81 percent of all wells in the county are completed in unconsolidated deposits and approximately 19 percent in bedrock. The unconsolidated deposits typically range from bedrock exposure along the White River in the north-central county to about 305 feet thick in the northeast.
  • The White River and Tributaries Outwash Aquifer System lies along the White River in the central county and three tributaries entering from the northwest and northeast. DNR reports wells completed at 25 to 277 feet, domestic yields typically up to 50 gpm, and high susceptibility to surface contamination where sand and gravel deposits are close to the surface and have little or no clay (moderate where relatively thick clay overlies them).
  • In bedrock, the Silurian and Devonian Carbonates Aquifer System (limestone and dolomite) is present in the central and eastern county, with typical domestic yields of 10 gpm or greater. In the New Albany Shale, which subcrops in a northwest-to-southeast trend, domestic yields are typically under 5 gpm and many dry holes have been reported.
  • MCPHD's testing brochure (WQ-GWQ00419) says coliform bacteria is very common, with about 40% of wells sampled testing positive for bacteria, and that arsenic is naturally occurring, comes from shale in the bedrock and is elevated or at unsafe levels in about 18% of samples.
  • MCPHD says approximately 30% of Marion County's drinking water comes from groundwater supplies, the majority from surface water, and it inspects regulated businesses in the county's seven Wellfield Protection Areas.

Communities Served

Indianapolis · Center Township · Decatur Township · Franklin Township · Lawrence Township · Perry Township · Pike Township · Warren Township · Washington Township · Wayne Township · Beech Grove · Lawrence · Southport · Speedway · Cumberland

Three side-by-side cross-sections of drilled wells. In sand and gravel, the casing runs to the bottom and a well screen lets water in while holding back sand. In sedimentary rock such as limestone, sandstone and shale, the casing runs through the soil into the rock, with an open hole below. In granite or other crystalline rock, a short casing is seated in hard rock and water enters the open hole through fractures.
Local geology sets how a well is built: wells in sand and gravel are cased to the bottom with a screen, while wells in rock are cased into bedrock and draw water from fractures.

Emergency Response Expectations

A no-water problem can be marked urgent when you submit a request, but no arrival time is promised. Chapter 18-202's notice to MCPHD and authorization to proceed still come before a pump is installed or the sanitary seal is broken, so ask the contractor how they handle that step on urgent jobs.

Marion County FAQs

Does replacing a well pump in Indianapolis need a county permit?

Under Chapter 18-202 the licensed pump installer must notify MCPHD and receive authorization before installing any pump, uncovering a buried upper terminal or breaking the sanitary seal, then obtain a signed pump permit within five business days after doing any of those things. Wells used solely for monitoring or for geothermal heating and cooling are outside the chapter.

Can we drink the water as soon as the pump work is done?

Not if the well seal was broken. Chapter 18-205 bars human consumption of water from an existing well whose seal has been broken until the Health Officer has approved both the well inspection and the water samples.

Can I get my well water tested for free in Marion County?

Yes. MCPHD says it tests well water at no cost to well owners. Its brochure recommends testing every year for bacteria and anions and every 3-5 years for heavy metals, and also after a change in taste, color or odor, a sudden or unexplained illness in the home, flooding near the well, or when pregnant or nursing women or children live there.

My test came back high in arsenic. Will a water softener fix it?

No. MCPHD's arsenic fact sheet says water softeners and pitcher filters will not remove arsenic and names reverse osmosis, distillation and special iron and aluminum units instead. Above 10 ppb, MCPHD recommends that you stop using the water for drinking or food preparation, and it warns that a new well is not guaranteed to be arsenic free.

Will MCPHD condemn my well if it fails a test?

MCPHD's brochure says it is not its policy to condemn wells or require treatment system installation for owner-occupied homes; it offers treatment recommendations instead. Chapter 18-103 still requires a well used for drinking, food preparation, washing or other direct human contact to be kept free of chemical, biological or radiological risks, with appropriate disinfection, treatment or other methods if it poses one, and 18-102 can require a public-main connection under the conditions above.

How deep are private wells in Marion County?

DNR's 2011 reports give ranges by aquifer rather than one county figure: 25 to 277 feet in the White River and Tributaries Outwash Aquifer System, 25 to 300 feet in the New Castle / Tipton Till Aquifer System, and 30 to 485 feet in the Silurian and Devonian Carbonates Aquifer System.

Last reviewed 2026-10-31

Need help in Marion County, IN?

Send the short form — urgent requests get priority routing.